9.20.2008

UPDATE: Sept 20, 2008

The foundation done, the cement for posts and beams of the ground floor have been poured and are being cured. What's mostly visible within the project area right now is wood, used as formworks that hold the cement in place.


View of the future utility that will lead to the kitchen.  A wall will be constructed around this area.

A view of the annex (The Half) from the second floor of The Cube.


A ramp was constructed beside The Cube for the cement mixer.


A shot of the annex from Mama's old garage.



The facade of the The Cube.

MORE HERE...

9.02.2008

UPDATE: Sept 2, 2008

Cube 1's opening that would have 6 glass doors facing the courtyard.


Shot of the The Half's facade facing the courtyard and The Cube.


View of what will be a private garden for the room on the ground floor of The Half.  An outdoor shower would be nice :-)


Shot of the future driveway.

View from the driveway.  We were able to save trees!  Beyond the trees is the private garden for the bedroom on the ground floor of The Half.


Another shot of The Cube's opening to the courtyard.


Shot of the annex (The Half) from Mama's old garage.

.