The windows have been installed. The bathrooms are almost done. The wooden flooring and ceramic tiles are complete. The sinks are taking shape. The doors have been primed and installed. The concrete tiles are to be set on the courtyard. I've finally agreed on the grills for security reasons. Fabian is currently fabricating them and will install them.
The facade.
A glimpse of the powder room.
No comments:
Post a Comment